SMXSpace Markets Index

SMI / 4

Spectrum and filings Early

Tracked deadlines: SpaceX Gen2 50% by 1 Dec 2028 · Amazon Leo 100% by 30 Jul 2029

Print 2026-W39.r7 · updated 30 Sep 2026, 12:04 PM CT · weekly review at each print; plus within 2 business days of a known due date · JSON · Rules

SystemAuthorityRequirementDueStatusIn orbitSource
Amazon Leo Gen1FCC50% (1,616) launched and operating30 Jul 2026Waived with conditions · verified392DA 26-553 (para. 3; sha256 6ec0c7a1bb32…)
Amazon Leo Gen1FCCProcessing-round priority restored for satellites deployed after 30 Jul 202630 Mar 2028 at the latestOpen · verified392DA 26-553 (para. 15; sha256 6ec0c7a1bb32…)
SpaceX Gen2 StarlinkFCC50% of the maximum authorised Gen2 satellites launched, in assigned orbits and operating1 Dec 2028Open · verified—DA 26-36 (para. 14.a.i; sha256 4d4df620f138…)
SpaceX Gen2 StarlinkFCCRemaining authorised Gen2 satellites launched, in assigned orbits and operating1 Dec 2031Open · verified—DA 26-36 (para. 14.a.i; sha256 4d4df620f138…)
Amazon Leo Gen1FCC100% (3,232) launched and operating30 Jul 2029Open · verified392 (≈12% of 3,232; GCAT, data to 28 Sep 2026)DA 26-553 (paras. 3 and 11; sha256 6ec0c7a1bb32…)
NGSO assignments whose 7-year period ended before 1 Jan 2021ITUM3: 100% deployed (deployment report due)1 Feb 2028Open · unverified—RES 35 - Timeframe (rule only)

Verified means the FCC order itself is captured (SHA-256 below and in the JSON). SpaceX Gen2 rows show — for In orbit. Note: Starlink total in orbit 11,158 (GCAT does not split Gen1 and Gen2). The ITU row is a rule date for a category of filings; no system is named under it. Information only; no score. Recent actions, last 90 days: none captured.

Status notes
  • Amazon Leo Gen1, due 30 Jul 2026: Waived with conditions, FCC order DA 26-553 (5 Jun 2026). Per the order (para. 15), satellites deployed after 30 Jul 2026 lose processing-round priority until the earlier of 30 Mar 2028 or 50% deployed (30 Oct 2027 if Amazon certifies construction and launch procurement). Per the order (para. 18), the surety bond is forfeited if the 50% milestone is not met on 30 Jul 2026.
  • Amazon Leo Gen1, due 30 Mar 2028 at the latest: Open. Per the order (DA 26-553, para. 15), priority returns on the earlier of 30 Mar 2028 or 50% deployed; 30 Oct 2027 if Amazon certifies it has built the satellites and procured the launches.
  • SpaceX Gen2 Starlink, due 1 Dec 2028: Open.
  • SpaceX Gen2 Starlink, due 1 Dec 2031: Open.
  • Amazon Leo Gen1, due 30 Jul 2029: Open; not changed by the waiver (DA 26-553, para. 11). If missed, the authorisation is reduced to the number operating on that date (para. 12).
  • NGSO assignments whose 7-year period ended before 1 Jan 2021, due 1 Feb 2028: Rule date with its category only (ITU Res. 35 timeframe, Case 2). No system is named under it: none is verified.
Captured orders
  • FCC DA 26-553 (EDOCS), Kuiper Systems LLC (Amazon Leo), adopted and released 5 Jun 2026 · captured 30 Sep 2026, 12:00 PM CT · SHA-256 6ec0c7a1bb32f969e19d1372aef40cd9708934a2297aff2ce30f22b7b00135c2
  • FCC DA 26-36 (EDOCS), Space Exploration Holdings (SpaceX Gen2), adopted and released 9 Jan 2026 · captured 30 Sep 2026, 12:00 PM CT · SHA-256 4d4df620f1386dfdf81fd99bd2a8073450a47cd152f8581548501755fba36c78